1. Ahuja, H. (1976). Construction performance control by networks. New York: John Wiley and Sons.
2. Ahuja, R., Magnanti, T., & Orlin, J. (1993). Network flows. Englewood Cliffs: Prentice Hall.
3. Ballestin, F., Schwindt, C., & Zimmermann, J. (2007). Resource leveling in make-to-order production: modeling and heuristic solution method. International Journal of Operations Research, 4, 50–62.
4. Bandelloni, M., Tucci, M., & Rinaldi, R. (1994). Optimal resource leveling using non-serial dynamic programming. European Journal of Operations Research, 78, 162–178.
5. Burgess, A., & Killebrew, J. (1962). Variation in activity level on a cyclical arrow diagram. Journal of Industrial Engineering, 13(2), 76–83.