1. Alabdullah SFI, Kadhim AJ, Khalaf HB (2020) Life cycle cost analysis for reinforced geogrid railway track. GEOMATE J 19(75):191–196
2. Bing AJ, Gross A (1983) Development of railroad track degradation models. Transp Res Rec 939:27–31
3. Caetano LF, Teixeira PF (2015) Optimisation model to schedule railway track renewal operations: a life-cycle cost approach. Struct Infrastruct Eng 11(11):1524–1536
4. Calle-Cordón A, Jiménez-Redondo N, Morales-Gámiz J, García-Villena F, Peralta-Escalante J, Garmabaki A, Famurewa SM, Duarte E, Morgado J (2018) Combined RAMS and LCC analysis in railway and road transport infrastructures. In: Proceedings of the 7th transport research arena TRA
5. Camille C, Mirza O, Senaratne S, Kirkland B, Clarke T (2022) Life cycle cost analysis of macro synthetic fibre reinforced concrete for railway sleeper applications. Struct Infrastruct Eng 20(3):1–15