1. Agistina A, Budiasih E, Pramoso A (2021) Determination of risk level, remaining life prediction, and risk based inspection planning based on API 581. Materials Science and Engineering 1034(1):12116
2. American Petroleum Institute (API) (2016) API RP 580 risk-based inspection. 3rd Edition. Publisher location: American Petroleum Institute API
3. American Society of Mechanical Engineers, Risk-based inspection- development of guidelines, Volume 2-Part 1, light water reactor (LWR) nuclear power plant components, CRTD-Vol. 20–2, ASME research task force on risk-based inspection guidelines, Washington, D.C. (1992).
4. American Society of Mechanical Engineers (1991) Risk-based inspection-development of guidelines, Volume 1, General Document, CRTD-Vol. 20–1, ASME research task force on risk-based inspection guidelines, Washington, DC
5. American Society of Mechanical Engineers (1994) Risk-based inspection- development of guidelines, Volume 3, fossil fuel-fired electric power generating station applications, CRTD-Vol. 20- 3, ASME research task force on risk-based inspection guidelines, Washington, DC