Author:
Ismail Wan Norizan Wan,Adnan Hamimah,Khalil Natasha,Azmi Bakhary Nor
Publisher
Springer International Publishing
Reference10 articles.
1. Alaghbari, W. E., Kadir, M. R. A., & Salim, A. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206.
2. Cheung, S. O., Wong, W. K., Yiu, T. W., & Kwok, T. W. (2008). Exploring the influence of contract governance on construction dispute negotiation. Journal of Professional Issues in Engineering Education and Practice, 134(4), 391–398.
3. Chini, A. R., & Valdez, H. E. (2003). ISO 9000 and the U.S. construction industry. Journal of Management in Engineering, 19(2), 69–77.
4. Hassanein, A. A., & El Nemr, W. (2008). Claims management in the Egyptian industrial construction sector: A contractor’s perspective. Engineering, Construction and Architectural Management, 15(3), 246–259.
5. Jaffar, N., Tharim, a. H. A., & Shuib, M. N. Factors of conflict in construction industry: A literature review. Procedia Engineering, 20, 193–202 (2011).