1. Baron, R.M., Kenny, D.A.: The moderator–mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations. J. Pers. Soc. Psychol. 51(6), 1173–1882 (1986)
2. Allen, M.: The efficient utilization of labor under conditions of fluctuating demand. In Muth, J.F., Thompson, G.L.: Industrial Scheduling. Prentice-Hall, Englewood Cliffs, 252–276 (1963)
3. Boysen, N., Fliedner, M., Scholl, A.: Produktionsplanung bei Variantenfließfertigung: Planungshierarchie und Elemente einer Hierarchischen Planung. J. Bus. Econ. 77(7–8), 759–793 (2007)
4. Boysen, N.: Variantenfließfertigung. Gabler, Wiesbaden (2005)
5. Freiheit, T., Li, W.: The effect of work content imbalance and its interaction with scheduling method on sequential flow line performance. Int. J. Prod. Res. 55(10), 2791–2805 (2017)