1. Abd Aziz N, Mohd Rahim FA, Aziz NM (2022) Delay mitigation strategies and the implication on the construction industry: a systematic literature review. Plann Malaysia: J Malaysian Inst Plan 20(5):223–234
2. Abd El-Razek ME, Bassioni H, Mobarak A (2008) Causes of delay in building construction projects in Egypt. J Constr Eng Manage 134(11):831–841
3. Al Gheth A, Sayuti MI (2021) An investigation of causes of delay affecting the United Arab Emirates construction industry. In: Mohamed Nazri F (ed) Proceedings of AICCE’19 lecture notes in civil engineering, vol 53. Springer, Penang, pp 403–413. https://doi.org/10.1007/978-3-030-32816-0_26
4. Al Nuaimi AS, Al Mohsin MA (2013) Causes of delay in completion of construction projects in Oman. In: International conference on innovations in engineering and technology (ICIET’2013), 25–26 Dec, Bangkok
5. Al Subhi OM et al (2022) Revisiting the causes of construction delays in Oman: a post-pandemic study. Association of Engineering, Project, and Production Management (EPPM), Athens