Author:
Fernandes Nuno O.,Guedes Nelson,Thürer Matthias,Ferreira Luis P.,Avila P.,Carmo-Silva Silvio
Publisher
Springer Nature Switzerland
Reference14 articles.
1. Abuhilal, L., Rabadi, G., Sousa-Poza, A.: Supply chain inventory control: a comparison among JIT, MRP, and MRP with information sharing using simulation. Eng. Manag. J. 18(2), 51–57 (2015)
2. Ptak, C., Smith, C.: Demand Driven Material Requirements Planning (DDMRP). Industrial Press, Norwalk, CT (2016)
3. Ptak, C., Smith, C.: Orlicky’s Material Requirements Planning 3/E. McGraw Hill Professional, New York (2011)
4. Miclo, R., Lauras, M., Fontanili, F., Lamothe, J., Melnyk, S.A.: Demand Driven MRP: assessment of a new approach to materials management. Int. J. Prod. Res. 57(1), 166–181 (2019)
5. Lee, C.J. and Rim, S.C.: A mathematical safety stock model for DDMRP inventory replenishment. Mathem. Prob. Eng. (2019)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献