Publisher
Springer Nature Switzerland
Reference28 articles.
1. Won, J., Cheng, J.C.P.: Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization. Autom. Constr. 79, 3–18 (2017). https://doi.org/10.1016/j.autcon.2017.02.002
2. Wuni, I.Y., Shen, G.Q.: Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. ECAM 27, 2315–2333 (2020). https://doi.org/10.1108/ECAM-10-2019-0534
3. O’Connor, J.T., O’Brien, W.J., Choi, J.O.: Critical success factors and enablers for optimum and maximum industrial modularization. J. Constr. Eng. Manage. 140, 04014012 (2014). https://doi.org/10.1061/(ASCE)CO.1943-7862.0000842
4. Bricogne, M., Eynard, B., Troussier, N., Antaluca, E., Ducellier, G.: Building lifecycle management: overview of technology challenges and stakeholders. In: International Conference on Smart and Sustainable City. p. 47. IET, Shanghai (2011). https://doi.org/10.1049/cp.2011.0284
5. Harkonen, J., Mustonen, E., Haapasalo, H.: Construction-related data management: classification and description of data from different perspectives. Int. J. Manag. Knowl. Learn. 8, 195–220 (2019)