Author:
Nyika Joan,Dinka Megersa Olumana,Mbao Evance Omondi
Publisher
Springer Nature Switzerland
Reference49 articles.
1. Aadal H, Rad K, Fard A, Sabet P, Harirchian E (2013) Implementing 3R concept in construction waste management at construction site. J Appl Environ Biol Sci 3(10):160–166
2. Aboginije A, Aigbavboa C, Thwala W, Segun S (2020) Determining the impact of construction and demolition waste reduction practices on green building projects in Gauteng province, South Africa. In: Proceedings of the international conference of industrial engineering and operations management, UAE, pp 2428–2437
3. Ajayi S, Oyedele L (2017) Policy imperatives for diverting construction waste from landfill: experts’ recommendations for UK policy expansion. J Clean Prod 147:57–65. https://doi.org/10.1016/j.jclepro.2017.01.075
4. Alite M, Omar H, Agurcia M, Jacome M, Kenney J, Tapia A, Siebel M (2023) Construction and demolition waste management in Kosovo: a survey of challenges and opportunities on the road to circular economy. J Mater Cycles Waste Manage 25:1191–1203. https://doi.org/10.1007/s10163-022-01577-5
5. Berge S, Von Blottnitz H (2022) An estimate of construction and demolition waste quantities and composition expected in South Africa. South African J Sci 118:12485. https://doi.org/10.17159/sajs.2022/12485