Publisher
Springer International Publishing
Reference20 articles.
1. Soekiman, A., Pribadi, K.S., Soemardi, B.W., Wirahadikusumah, R.D.: Factors relating to labor productivity affecting the project schedule performance in Indonesia. Procedia Eng. 14, 865–873 (2011)
2. Chigara, B., Moyo, T.: Factors affecting labor productivity on building projects in Zimbabwe. Int. J. Archit. Eng. Constr. 3(1), 57–65 (2014)
3. Sukumar, D., Kumar, V.: A study of various factors affecting labour productivity and methods to improve It. Int. J. Sci. Eng. Res. 7(4), 11–14 (2016)
4. Alinaitwe, H., Mwakali, J., Hansson, B.: Factors affecting the productivity of building craftsmen - studies of Uganda. J. Civ. Eng. Manag. 13(3), 169–176 (2007)
5. Abdul Kadir, M., Lee, W., Jaafar, M., Sapuan, S., Ali, A.: Factors affecting construction labour productivity for Malaysian residential projects. Struct. Surv. 23(1), 42–54 (2005)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献