1. Chang YJ. Multi-objective scheduling for IC sort and test with a simulation test bed. IEEE Tran Semi Cond Manuf. 1998;11(2):304-15.
2. Li L, Qiao F, Jiang H. The research on dispatching rules for improving on time delivery for semi conductor wafer fab. In: 8th International Conference on Control, Aero Machine, Robotics and Vision ICARCV, 2004, p. 404–4.
3. Wu MC, Huag Y, Chang VC, Yang KF. Dispatching in semi conductor with machine-dedication features. Int J Adv Manuf Techhnol. 2006;28(9):978–84.
4. Chen JC, Chen KH, Wu JJ, Chen CW. A study of the flexible job shop scheduling problem with parallel machine and re-entrant process. Int J of Adv Manuf Technol. 2008;39(3–4):344–5.
5. Baek DH, Yoon WC, Part SC. A special rule adaptation procedure for reliable production control in a wafer fabrication system. Int J Pro Res. 1998;36(6):147–9.