Abstract
In Manaus, delays in public constructions are not uncommon as their execution deadlines are often extrapolated, even though such deadlines are obtained through preliminary technical studies. The causes that give rise to such delays are varied ranging from the occurrence of rain to the addition of quantities of existing services or additions of new services. In this research, we sought to obtain a model, using fuzzy logic, to predict the risk of delay that some variables may cause in the period of execution of the work, allowing the public administration or the contracted company to adopt measures they consider essential to mitigate this delay. Initially, documentary and bibliographic research were carried out to identify the causes that most contribute to the occurrence of delays in the works. Once these causes were identified, the construction of the fuzzy inference system was started, with six of the most significant causes identified in the research being considered as linguistic variables, namely: the hiring factor, which corresponds to the quotient between the value of the proposal. of the company and the amount budgeted by the administration; the value of the work, which is the value of the contract for the work; the engineering execution drawing, which are the engineering drawings used in the works; the alteration of quantities, which are changes in the quantities of existing services or addition of new services; authorization from public agencies, which corresponds to the permission or support of any public agency or public company for the execution of the work; and the rain. For the simulation of the created fuzzy inference system, real data from four public works were entered, and the answers of this simulation were satisfactory because they are confirmed by the documentation of the respective works. It is concluded that the system proved to be useful, as it was possible to predict the risk of delay in the execution of public works in the city of Manaus, and it can be used by both the public administration and the contractor to mitigate the causes of delays in the execution of public works.
Publisher
International Journal for Innovation Education and Research
Reference22 articles.
1. ARAGÃO FILHO, S. A. P. “O custo do atraso em obras públicas viárias”, 2014, Disponível em Acesso em 3 de agosto de 2020, 18h25min.
2. ARESE, M. C. “Maturidade da gestão de ativos físicos de processos: uma perspectiva sustentável utilizando lógica nebulosa", 2018, 228f, Tese (Doutorado em sistemas de gestão sustentáveis) – Universidade Federal Fluminense, Niterói, 2018.
3. ASSAF, S. A., AL-HEJJI, S. “Causes of delay in large construction projects”, International Journal of Project Management, v. 24, n. 4, pp. 349-357, 2006.
4. BHATT, R., MACWAN, J. E. M. “Fuzzy Logic and analytic hierarchy process–based conceptual model for sustainable commercial building assessment for india”, Journal of Architectural and Engineering, v. 22, n. 1, pp. 04015009 (1-10), 2016.
5. BRASIL. Tribunal de Contas da União. Obras públicas: recomendações básicas para contratação e fiscalização de obras públicas, 2ª ed., Brasília: TCU, SECOB, 2009.