Risk Prediction of Delay in the Execution of Public Works Through Fuzzy Logic

Author:

Valente AndreyORCID,Nascimento ManoelORCID

Abstract

In Manaus, delays in public constructions are not uncommon as their execution deadlines are often extrapolated, even though such deadlines are obtained through preliminary technical studies. The causes that give rise to such delays are varied ranging from the occurrence of rain to the addition of quantities of existing services or additions of new services. In this research, we sought to obtain a model, using fuzzy logic, to predict the risk of delay that some variables may cause in the period of execution of the work, allowing the public administration or the contracted company to adopt measures they consider essential to mitigate this delay. Initially, documentary and bibliographic research were carried out to identify the causes that most contribute to the occurrence of delays in the works. Once these causes were identified, the construction of the fuzzy inference system was started, with six of the most significant causes identified in the research being considered as linguistic variables, namely: the hiring factor, which corresponds to the quotient between the value of the proposal. of the company and the amount budgeted by the administration; the value of the work, which is the value of the contract for the work; the engineering execution drawing, which are the engineering drawings used in the works; the alteration of quantities, which are changes in the quantities of existing services or addition of new services; authorization from public agencies, which corresponds to the permission or support of any public agency or public company for the execution of the work; and the rain. For the simulation of the created fuzzy inference system, real data from four public works were entered, and the answers of this simulation were satisfactory because they are confirmed by the documentation of the respective works. It is concluded that the system proved to be useful, as it was possible to predict the risk of delay in the execution of public works in the city of Manaus, and it can be used by both the public administration and the contractor to mitigate the causes of delays in the execution of public works.

Publisher

International Journal for Innovation Education and Research

Reference22 articles.

1. ARAGÃO FILHO, S. A. P. “O custo do atraso em obras públicas viárias”, 2014, Disponível em Acesso em 3 de agosto de 2020, 18h25min.

2. ARESE, M. C. “Maturidade da gestão de ativos físicos de processos: uma perspectiva sustentável utilizando lógica nebulosa", 2018, 228f, Tese (Doutorado em sistemas de gestão sustentáveis) – Universidade Federal Fluminense, Niterói, 2018.

3. ASSAF, S. A., AL-HEJJI, S. “Causes of delay in large construction projects”, International Journal of Project Management, v. 24, n. 4, pp. 349-357, 2006.

4. BHATT, R., MACWAN, J. E. M. “Fuzzy Logic and analytic hierarchy process–based conceptual model for sustainable commercial building assessment for india”, Journal of Architectural and Engineering, v. 22, n. 1, pp. 04015009 (1-10), 2016.

5. BRASIL. Tribunal de Contas da União. Obras públicas: recomendações básicas para contratação e fiscalização de obras públicas, 2ª ed., Brasília: TCU, SECOB, 2009.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3